产品展示
  • 老款别克陆尊扶手箱新GL8系列越野专用储物商务车收纳盒配件18款
  • 2022款雪佛兰科沃兹门槛条贴改装配件迎宾踏板车内饰装饰汽车用品
  • 后备箱储物盒专用于2021款19新楼兰收纳箱改装汽车收纳箱装饰配件
  • 适用于荣威RX5 ERX5仪表中控台 仪表台空调出风口 冷暖风出风口
  • 骆驼天鹅汽车电瓶12V60AH55D26R丰田皇冠锐志马自达6哈弗H2H3H5H6
联系方式

邮箱:admin@aa.com

电话:020-123456789

传真:020-123456789

汽车配件

Moon's expansion plan for Gaesong complex requires over $8 bil: analysis

2024-06-15 14:23:36      点击:204
North and South Koreas' joint industrial complex in the North's border city of Gaesong / Yonhap
North and South Koreas' joint industrial complex in the North's border city of Gaesong / Yonhap

President Moon Jae-in's campaign pledge to develop more land for the now-shuttered industrial park in the North Korean border town of Gaesong will require around 9 trillion won ($7.98 billion), an analysis showed Saturday.

The analysis, which is based on data provided to Rep. Shim Jae-chul of the main opposition Liberty Korea Party by the unification ministry and operator of the complex Hyundai Asan Corp., puts the estimated cost for the development plan at 9.13 trillion won.

On the campaign trail, Moon promised to develop 30 million square meters of more land for the Gaesong industrial complex. The land developed for the complex had been around 92,500 square meters.

Shim claimed that about 1.79 trillion won has been invested in developing the complex, which is some 700 billion won more than what the unification ministry previously estimated.

N. Korea running hydroelectric power plant near Gaeseong N. Korea running hydroelectric power plant near Gaeseong 2017-10-13 17:00  |  North Korea
The factory zone, launched in 2004, had accommodated 124 South Korean firms which employed more than 54,000 North Korean workers to produce labor-intensive goods such as clothes and utensils.

Seoul shut down the joint production zone in February 2016 in response to Pyongyang's nuclear and missile tests. (Yonhap)



British women pen emotional letters to Theresa May before she meets Trump
Diplomacy key to resolving North Korea crisis